Connect commits, artifacts, and deployments
At build time, record the source repository, exact Git commit, and CI run. Link the build result to its immutable artifact digest and associate the versioned configuration snapshot with the deployment that uses it.
- Git commit→CI run→Artifact digest
- Deployment binding→Expected snapshot and digest
- Observed instance and time→Binding and observed digest
Have an observer report the instance identity, binding, observed digest, and observation time. During a rollout, each binding can carry a different expected version, so keep these links per binding and environment.
Verify the Checkout rollback
The Commerce demo replays a Checkout rollback with separate release records and instance observations.
| Time (UTC) | Simulated release evidence |
|---|---|
| 06:06 | The health gate fails. |
| 06:30 | The rollback starts. |
| 06:31 | The release controller records completion. |
The replay shows Checkout back on v2.4.0. To verify customer traffic recovery, compare load-balancer target health, Checkout latency, and error rates with the pre-release baseline.
Choose evidence for the question
To answer which commit produced a running image, follow its observed digest to the CI build and source commit. To answer which configuration was expected, follow the deployment binding to its snapshot. Use both records when a rollout spans multiple versions.
Publish a versioned bundle and a CI result using the first-service integration steps. For an unexpected configuration on an otherwise familiar artifact, follow the configuration drift walkthrough.